WC-630 / Finish

Cerakote / Powdercoat

Route reviewed coating work through substrate preparation, masking, approved color, application, cure, and final acceptance.

Route a coating project ↗
Identical DiaTread diamond-plate stair treads suspended by paired process hooks through rear-flange holes in an automated powder-coating booth
EXOCNC PROCESS VISUALIZATION / FIRST LIVE REDLINE
Work centerWC-630
OperationCerakote or powdercoat finishing
Routing modeSample approval / project finish / repeat production
Commercial modeQuoted independently per reviewed project

Every project is reviewed and quoted independently.

FINISH ROUTE

Approve the finish before the production lot.

The operation keeps substrate, preparation, masking, color, texture, cure, and visual acceptance in the same record.

  1. 01Review the finish

    Confirm substrate, preparation, masking, color, texture, quantity, visible faces, and acceptance requirements.

  2. 02Release color + sample

    Keep approved finish system, color, sheen, texture, masking, and sample attached to the operation.

  3. 03Prepare + coat

    Complete the released Cerakote or powdercoat scope under the reviewed finish process.

  4. 04Check + hand off

    Verify coverage, masking, appearance, and released features before assembly, inspection, packing, or shipment.

WORK-CENTER RECORD

The fields production will need later.

Typical input
Reviewed parts / substrate / approved finish / masking / quantity
Released output
Coated parts / appearance check / next-route identification
Required handoff
Assembly / inspection / packing / shipment
Schedule unit
Estimated and scheduled per approved finish system and lot
Quality gate
Coverage, masking, visible appearance, and released functional surfaces checked per project
Capability boundary
Substrate, preparation, coating system, color, texture, sheen, masking, dimensions, quantity, price, and lead time are confirmed during review.