WC-220 / Joining
TIG Welding
Keep the reviewed joint, fit-up, fixture, weld sequence, finish, and inspection handoff in one operation.
Work centerWC-220
OperationTIG welding / controlled manual joining
Routing modeFirst article / prototype / repeat production
Commercial modeQuoted independently after material and joint review
Every project is reviewed and quoted independently.
TIG ROUTE
A reviewed joint with a controlled handoff.
The operation stays separate from cutting, machining, finish, and assembly while preserving the full joint context.
- 01Review the joint
Confirm material, joint geometry, fit-up, quantity, finish, and acceptance requirements.
- 02Release fit-up + fixture
Keep part location, support, access, weld sequence, and distortion control attached to the operation.
- 03Complete the TIG weld
Run the released welding scope for the approved first article or recurring lot.
- 04Check + hand off
Verify the required weld condition and release the assembly to cleanup, finish, inspection, or assembly.
WORK-CENTER RECORD
The fields production will need later.
- Typical input
- Approved parts / material / joint / fit-up / quantity
- Released output
- TIG-welded assembly / weld check / next-route identification
- Required handoff
- Cleanup / finish / inspection / assembly
- Schedule unit
- Estimated and scheduled per reviewed joint and lot
- Quality gate
- Weld condition confirmed by the method released for the project
- Capability boundary
- Material, thickness, joint design, filler, fixture, distortion, weld acceptance, quantity, price, and lead time are confirmed during review.